Security Reinforcements at Dite-Dime Bridge Amid Protests
In response to escalating anti-dam protests, significant security measures have been implemented at the Dite-Dime bridge in Arunachal Pradesh.
Dite-Dime bridge is crucial for access to the India-China border and proposed dam sites.
Heavy deployment of CAPF personnel has been initiated due to ongoing protests.
Recent clashes resulted in injuries, highlighting tensions in the region.
In Arunachal Pradesh, the Dite-Dime bridge has seen a substantial increase in security forces due to rising anti-dam protests. This bridge serves as a vital connection towards the India-China border and links four proposed drilling locations for the Siang Upper Multipurpose Project, which has a capacity of 11,200 MW.
The bridge, also referred to as 65 Bridge, has become a central point for the anti-dam movement, where demonstrators have organized dharnas and protests against the proposed pre-feasibility survey. In response, authorities have deployed around 30 companies of Central Armed Police Forces (CAPF) across districts affected by the protests, with additional support from three companies of the Assam Police Battalion stationed in Pasighat.
On October 23, tensions escalated when clashes broke out during a 12-hour bandh, resulting in injuries to at least four women. Reports indicate that over 150 protestors engaged in violent confrontations with security personnel, attempting to breach barricades and causing damage to security vehicles.
The situation at the Dite-Dime bridge has broader implications for the region, as it not only affects local communities but also raises concerns about the potential environmental impacts of the Siang Upper Multipurpose Project. The protests reflect a growing resistance among local populations against large-scale infrastructure projects that they believe threaten their livelihoods and the environment.
Looking ahead, the authorities are likely to maintain a heightened security presence at the bridge, especially as protests continue. The situation remains fluid, and further developments are expected as both sides navigate the ongoing tensions surrounding the dam project.


