Traffic Chaos Persists Near Ajni Underpass Amid Ongoing Construction

Commuters face severe congestion and unsafe conditions as work on the Ajni underpass continues, impacting daily travel.

A
Aapla Nagpur Desk
24 Nov 2026, 9:49 AM IST · 2 min read
Source: TOI
Traffic Chaos Persists Near Ajni Underpass Amid Ongoing Construction
KEY TAKEAWAYS
1

The road between Ajni Ittabhati Chowk and Congress Nagar is severely congested due to construction and poor traffic management.

2

Students and railway passengers are at risk due to inadequate pedestrian space and chaotic traffic conditions.

3

The underpass is part of a Rs35-crore project aimed at improving traffic flow in the area.

Nagpur is currently experiencing significant traffic disruptions as construction on the Ajni underpass continues, creating a challenging environment for commuters. The stretch between Ajni Ittabhati Chowk and Congress Nagar has become a focal point of frustration, exacerbated by narrowed roads and ineffective traffic control measures. Vehicles are often seen navigating through barricades, leading to rampant wrong-side driving and a lack of space for safe passage.

The situation is particularly dire for railway passengers, many of whom are burdened with heavy luggage. With pedestrian pathways nearly nonexistent, these individuals are forced to walk alongside moving traffic, heightening the risk of accidents. The presence of two educational institutions in the vicinity further complicates matters, as hundreds of students traverse this hazardous route daily, facing the dangers posed by speeding vehicles and erratic driving behaviors.

Adding to the woes of commuters, the road conditions near the diversion signage are deteriorating, with numerous potholes creating additional obstacles. Motorists are compelled to navigate these damaged areas while contending with heavy traffic, leading to further delays. A recent measure to close a divider opening, which had previously been a significant congestion point, has been implemented, but it remains to be seen if this will alleviate the ongoing issues.

The ongoing construction of the underpass is part of a larger Rs35-crore initiative aimed at enhancing the roadway between Ajni Bridge and TB Ward Square, transforming it into a six-lane corridor. This project is expected to connect with the Ajni twin cable-stayed bridges, currently under development by the Maharashtra Rail Infrastructure Development Corporation (MRIDC). Once completed, the underpass is anticipated to streamline traffic flow between Congress Nagar and FCI, allowing vehicles from Kriplani Square to access Ajni Bridge more efficiently.

As the project progresses, the local community and commuters are left hoping for timely completion and improved traffic management strategies. The ongoing construction has raised concerns about safety and accessibility, prompting calls for immediate attention to the chaotic conditions that currently plague this vital transport route.

💬What did you think of this story?What did you think?

Read Next

Traffic Issues Near Ajni Underpass in Nagpur